Smoke Curtain D120

D120 SMOKE CURTAIN
A D120 smoke curtain helps form the boundary of a smoke reservoir within a designed smoke control system.
Provide the reservoir layout, curtain bottom level and expected air movement together with the opening dimensions. Check how adjacent barriers join and whether the installation remains within the documented size range. Coordinate the curtain and extraction sequence before choosing controls.
Design
A smoke curtain limits the spread of the smoke layer at its designed boundary. Extraction and replacement air are provided by the wider smoke control system; the curtain does not extract smoke. A fixed barrier remains in position, while an automatic one moves to the specified depth on command. D120 is a smoke-barrier performance designation, not an EI fire-resistance or door smoke-leakage class.
Backup-power capacity and power-loss response are confirmed for the selected controls and project sequence.
What are the Uses?
Used at the designed boundary of smoke reservoirs in atriums, transport buildings and other spaces with an engineered smoke control strategy.
Strength Limit
D60, D120
Smoke Curtain Dimensions
| Maximum Width | Maximum Height |
|---|---|
| Subject to evidence | 10 m |
Dimensions
| Curtain Drop | Single Roller Headbox (Max Width 5.5m) |
Side by Side Headbox (Up to 45m) |
Over Under Headbox (Up to 45m) |
|---|---|---|---|
| Up to 1.5m | 150x150mm | 150x150mm | 150x150mm |
| 1.501m - 4.0m | 150x150mm | 150x150mm | 150x150mm |
| 3.001m - 6.0m | 150x150mm | 150x150mm | 150x150mm |
| 6.001m - 12.0m | 200x220mm | 150x150mm | 150x150mm |
Note
Fabric
Box
Assemblage
The space can be mounted on the inside, on the wall forehead, inside the suspended ceiling, in the profile.
Product Color
Technical Documents and Related Systems
Published dimensions describe catalogue arrangements. Confirm the exact dimensions, components and support against current product evidence before ordering.
BS EN 12101-1 — smoke barrier scope explains the standard scope; project suitability also needs the applicable assembly documents.
Product Videos
NEED A FIRE RESISTANCE SOLUTION?

- Classification matched to the approved project requirements.
- Technical evidence reviewed for the exact proposed configuration.
- Project-based coordination from initial review to installation inputs.
